An engineer in a hard hat reviewing a building site under construction, with tower cranes against a sunset sky
Dubai engineers (DEQ)

Dubai Municipality Engineer Exam Practice (DEQ)

Practise in the real format. Walk in ready.

Original questions based on the Dubai Building Code (2021), its UAE Fire and Life Safety Code cross-references, the DM Code of Construction Safety Practice and Al Sa'fat, with the working shown for every calculation. Try 5 questions free, no sign-up.

14-day money-back guarantee. Not happy for any reason? Full refund.

Free test → pay AED 21 → instant access + emailed link

  • No login needed
  • 14-day money-back guarantee
  • Built from the official syllabus and sources
5 free questions, no login14-day money-back guaranteeOne payment, no subscription

Free test: 5 questions

Here are 5 free questions from different topics. Pick an answer to see the explanation.

DM Engineer Exam: free practice test

5 free questions. No login required.

  • 5 questions
  • About 6 min
  • Instant feedback
  • Free test

Tap an answer to see straight away if it is right, with a full explanation. Your scores are saved on this device only.

Full access AED 21

14-day money-back guarantee. Not happy for any reason? Full refund.

Full pack: what you get
  • Dubai Building Code general: 16 questions
  • Structural design & loads: 18 questions
  • Concrete & steel: 14 questions
  • Foundations & geotechnics: 12 questions
  • Fire & life safety (UAE Fire Code): 15 questions
  • Accessibility: 11 questions
  • Building permits & DM procedures: 10 questions
  • Site safety & supervision: 12 questions
  • Green building (Al Sa'fat): 10 questions

118 questions in total · practise section by section · 30 days of access

Full access AED 21

What is the Dubai Municipality engineer exam?

Engineers who work on licensed consultancy or contracting activities in Dubai register through Dubai Municipality's Dubai Engineering Qualification (DEQ) system. Where an activity requires an exam, the engineer must pass the Municipality's multiple-choice accreditation test and meet the experience standards before being linked to the licence. The exams are open to individuals before a company licence is issued.

The exam format

Booked throughYour individual account on the DEQ system (My Exams, then "Apply for New Accreditation")
FormatMultiple choice at a testing centre
Main referenceThe Dubai Building Code (2021), which works together with the UAE Fire and Life Safety Code of Practice
Question count and pass markNot published by Dubai Municipality
Documents from abroadMust be attested by the UAE Ministry of Foreign Affairs

Each activity has its own experience rules, set out in Dubai Municipality's licensing standards for consultants and contractors. Check the standards for your activity before you apply.

What the exam covers

  • Dubai Building Code general rules: scope, adoption, definitions, GFA and FAR, alternative solutions
  • Structural design and loads: ASCE/SEI 7-16 combinations, DBC dead and live loads, wind and seismic rules for Dubai
  • Concrete and steel: minimum strengths, Table F.3 mixes, cover, durability, coatings and fire resistance
  • Foundations and geotechnics: boreholes, investigation depth, piles, shoring and dewatering
  • Fire and life safety: building height classes, exits, emergency command centres, firefighting lifts, atria and façades
  • Accessibility: ramps, doors, lifts and accessible parking under DBC Part C
  • Building permits and DM procedures: Decree 45 of 2021 and the DEQ system
  • Site safety and supervision: the DM Code of Construction Safety Practice
  • Green building: Al Sa'fat and the DBC thermal envelope limits

Free official resources, and what we add

Dubai Municipality publishes the Dubai Building Code free of charge, along with the Code of Construction Safety Practice, the DEQ user guides and a contractor FAQ. There is no official practice question bank. Our 118 questions are original, grouped into 9 topics, and every explanation cites the DBC clause or official document it comes from. Calculation questions (loads, moments, seismic parameters, boreholes, ramps and parking) show the full working.

How to prepare

  1. Download the Dubai Building Code and read Part A first: it explains how the other Parts fit together.
  2. Learn the key numbers in Part F: 25 kN/m³ concrete, 3.5 kN/m² car parks, 1 kN/m² minimum wind pressure, fcu 35 N/mm² minimum strength.
  3. Know the height classes: mid-rise over 15 m, high-rise 23 m to 90 m, super high-rise over 90 m.
  4. Practise the standard calculations until they are quick: load combinations, wL²/8, FAR, ramp lengths and accessible parking counts.
  5. Read the scaffolding and excavation chapters of the Code of Construction Safety Practice.
  6. Practise by topic, then take timed mock exams.

Practice questions with answers

Tap a question to see the correct answer and explanation.

Which decree gave the Dubai Building Code legal force?
  1. Decree No. 19 of 2025
  2. Decree No. 45 of 2021
  3. Local Order No. 3 of 1999
  4. Law No. 11 of 2010

Answer: B, Decree No. 45 of 2021. Decree No. (45) of 2021 Concerning the Dubai Building Code establishes the DBC, approved by the DM Director General. Decree 19 of 2025 concerns safety in construction work, Local Order 3 of 1999 regulates construction activities, and Law 11 of 2010 concerns vessel licensing. Source: Decree No. (45) of 2021, Articles 2 and 5.

Which edition of ASCE/SEI 7 does DBC Part F mandate for loads?
  1. ASCE/SEI 7-16
  2. ASCE/SEI 7-10
  3. ASCE/SEI 7-22
  4. Whichever edition is latest

Answer: A, ASCE/SEI 7-16. F.7.1 requires loads to be defined in accordance with ASCE/SEI 7-16, and A.4.2 cites Part F mandating the 2016 edition as an example of a fixed edition. Source: Dubai Building Code (2021 edition), Part A, A.4.2 and Part F, F.7.1.

What minimum compressive strength does the DBC require for structural concrete?
  1. fcu = 25 N/mm² (f′c = 20 N/mm²)
  2. fcu = 40 N/mm² (f′c = 32 N/mm²)
  3. fcu = 30 N/mm² (f′c = 24 N/mm²)
  4. fcu = 35 N/mm² (f′c = 28 N/mm²)

Answer: D, fcu = 35 N/mm² (f′c = 28 N/mm²). F.6.2.2 requires structural concrete to have fcu not less than 35 N/mm² and f′c not less than 28 N/mm². fcu 40 / f′c 32 is the minimum for post-tensioned slabs and beams (F.6.3.3). Source: Dubai Building Code (2021 edition), Part F, F.6.2.2.

Get the full Dubai Municipality engineer exam practice pack

Unlock all 118 questions, timed mock exams, practice by topic and an explanation for every answer. Works on your phone, with 30 days of access.

Questions and answers

How do I apply for the Dubai Municipality engineer exam?

Through your individual account on the Dubai Engineering Qualification (DEQ) system: go to My Exams and choose "Apply for New Accreditation".

Can I take the DM exam before my company licence is issued?

Yes. Dubai Municipality says the exams are open to individuals and companies, so you can sit it before the licence is issued.

What does the Dubai Municipality engineer exam cover?

It is based mainly on the Dubai Building Code (2021), which works with the UAE Fire and Life Safety Code. Expect general code rules, structure, fire safety, accessibility, permits and site safety.

What is the pass mark for the DM engineer exam?

Dubai Municipality does not publish the number of questions or the pass mark. Check the details in your DEQ account when you book.

Which Al Sa'fat level is mandatory?

Dubai Municipality states that all new buildings must meet the requirements for the Silver Sa'fa. Golden and Platinum are optional higher levels.

Are these the real exam questions?

No. Our questions are original and written from the official documents. We are not linked to Dubai Municipality.

Other practice tests

Sources (checked 26 October 2026): Dubai Municipality, Dubai Building Code (2021 edition) · Dubai Legal Portal, Decree No. (45) of 2021 Concerning the Dubai Building Code · Dubai Municipality, Dubai Engineering Qualification System Guide · Dubai Municipality, Frequently Asked Questions for Contractors (DEQ) · Dubai Municipality, Code of Construction Safety Practice · Dubai Municipality, Al Sa'fat Dubai Green Building System

Checked against the Dubai Building Code (2021 edition) and Decree No. (45) of 2021, the Dubai Municipality Code of Construction Safety Practice, Dubai Municipality DEQ guidance and the Al Sa'fat Dubai Green Building System. Last reviewed: October 2026.